Metropolitan International School

New Cairo

Challenges

 

  • High safety requirements for load-bearing which exceeding 5 times the boards weight
  • Complex ceiling designs and high standards specification, especially fire, moist and hygiene standards
  • Quality of aesthetic requires intensive training and on-site follow-up to ensure high level of installation standards.

Outcome



•Completion of the project with the planned project schedule

  • Complex standards required has been achieved with high quality finishing of aesthetic and functional objectives in all areas of the school especially in the indoor pool area
  • Excellent cooperation with the architect in the interior design and specification phase
  • Full support with the contractor in the installation phase and guiding him to achieve the required design

Project information

Client

Mr. Seif Sameh Fouad

Main contractor

Modern Architecture for contracting

Architect

Engineering Consultant Group - ECG