Challenges

  • Delay in project time and need to build high thickness to achieve wall levelling (up to 20 cm thickness)
  • A thickness that can’t be achieved by traditional methods and will require very long time and difficult preparations to ensure the bonding between layers of plastering

Outcome

  • Using Gyplast Fix to prepare vertical screeds and use Gyplast Fill to build the thickness
  • The thickness was achieved with more than 20% saving in time compared to traditional method

Project information

Client

Armed forces

Main contractor

Hany Bekir

Architect

Armed Forces Engineering Authority